## Summary - What changed: - Why: ## Architecture Plan Sync (Required) - Master plan file: `/Users/earth/Desktop/waoowaoo/docs/architecture-unification-master-plan.md` - [ ] I updated the phase status board (`✅/🔄/⏸/⚠️`) in the same PR. - [ ] I recorded concrete file-level changes under the corresponding phase. - [ ] I kept the plan date/current-context consistent with the code changes in this PR. ## Phase Status Delta (Required) | Phase | Before | After | Evidence (file path) | | --- | --- | --- | --- | | e.g. Phase 1.2 | 🔄 | ✅ | `src/lib/query/task-target-overlay.ts` | ## Guardrails Checklist (Required) - [ ] No compatibility layer introduced. - [ ] No silent fallback introduced. - [ ] No hidden default or fake data introduced. - [ ] Errors remain explicit and traceable. ## Validation - Commands run: - Manual verification: ## Risks - Known impact/risk: - Follow-up tasks: