912 B
912 B
Summary
- What changed:
- Why:
Architecture Plan Sync (Required)
- Master plan file:
/Users/earth/Desktop/waoowaoo/docs/architecture-unification-master-plan.md - I updated the phase status board (
✅/🔄/⏸/⚠️) in the same PR. - I recorded concrete file-level changes under the corresponding phase.
- I kept the plan date/current-context consistent with the code changes in this PR.
Phase Status Delta (Required)
| Phase | Before | After | Evidence (file path) |
|---|---|---|---|
| e.g. Phase 1.2 | 🔄 | ✅ | src/lib/query/task-target-overlay.ts |
Guardrails Checklist (Required)
- No compatibility layer introduced.
- No silent fallback introduced.
- No hidden default or fake data introduced.
- Errors remain explicit and traceable.
Validation
- Commands run:
- Manual verification:
Risks
- Known impact/risk:
- Follow-up tasks: